Home Grounding
The installation of the grounding system for this home was not completed. Simply, without getting into the grounding exceptions with OHMs, of resistance, a new home is required to have 2 ground rods installed at the exterior or 1 ufter ground.
The ufter ground rod was installed in the foundation and was coming up in the designated area inside the home. However, the grounding cable or conductor was not installed from the meter box to the ufer ground rod. Until this is completed, there is not grounding system for the home.
You need and inspector who takes the time to investigate issues. Choose Powerworks Inspections.